Nepta Gas

One of the projects of Nabta Petroleum Company to support the country’s development process in the field of petroleum derivatives The steps of the project started with the construction of a gas depot at Al-Jili refinery, consisting of the following:

Gas Tanks:

As a start of the project, we constructed four tanks, each with a capacity of 160 cubic meters (approximately 320 tons).

Cylinder filling platform:

The platform consists of 30 packing units with a capacity of 45 tons/hour

Loading and unloading platform:

It consists of 4 filling lanes that work simultaneously and at a very high speed


Vectors:


The company owns a fleet of 10 tankers with a capacity of 65 cubic meters with a total of 350 tons and four small tankers under manufacture to transport gas.

Gas Filling Units

The company also owns 13 small packaging units with different capacities of 10 tons and 5 tons These assets and storage capacities represent a starting point for the Napata Gas Project and to harness these capabilities to be of assistance in solving the country’s gas problems.